Chapter 05 walkthrough

CLAIM THE WESTERN FARM

Acquire the farm, reach 100 MW and commission the Western Grid Connection.

Game version 1.0.7 · Reviewed 23 October 2026

Chapter 5 is an expansion and grid-integration project. Its central distinction is installed generation versus live surplus: the objective asks for 100 MW of installed capacity. The farm purchase, station and final utility connection are separate milestones.

Claim the western farm — Sector 47 artwork
Sector 47 website artwork

Your route through the chapter

From plan to operation

Optional checklist · saved in this browser only.

01

Purchase the abandoned farm

Use the rotating purchase marker on the western parcel. The land costs $2.5 million. Acquisition clears and opens the parcel for the expansion.

02

Complete Energy 3

The mission calls it Energy Systems III: High-Voltage Grid Integration. Finish Energy Systems II and upgrade the Research Center to Level 2 first. The research takes 120 seconds at the authored base duration.

03

Build and road-connect the Western Grid Station

The station is included in the land transfer, with no separate purchase price. Place it along the western farm boundary and connect its access marker to the base road network.

04

Reach at least 100 MW of installed generation

Add or upgrade generation until the mission shows 100 MW. Solar and wind contribute capacity; batteries provide storage and do not replace this generation target. This is not a requirement to export 100 MW of surplus.

05

Fund and commission the Western Grid Connection

Once the previous requirements are met, pay $1.25 million for the connection. Allow the four-minute cable, protection and metering sequence to finish. The chapter closes when the connection is energized, not when payment is made.

When progress stops

Common blockers

I own the farm but cannot place the station

Complete Energy 3 and confirm that the farm purchase is finished. The station belongs along the parcel’s western boundary.

The station is built but the connection is unavailable

Check its road access, the 100 MW installed-generation target and the $1.25 million funding requirement.

My power output varies below 100 MW

Read the mission’s installed-capacity figure. The chapter’s threshold is distinct from instantaneous operating output or net surplus.

Do I need a harbor to complete Chapter 5?

No. Security, road modernization and harbor development belong to the following chapter.

Your program starts here

NEXT STOP.
SECTOR 47.

A coastline to reclaim. A space program to build.

Available for Mac, iPhone & iPad. Opens the official App Store listing.

Mac App StorePlay on MacApp StorePlay on iPhone / iPad