MW Grid Capacity
Scale installed electrical capacity from basic 4.0 MW starter reserves up to 100 MW+ high-voltage regional grid connections ($1.25M intertie).
MARS47 / COASTAL LOGISTICS
PLAY ON MAC
From grading dirt tracks to high-voltage substation integration, build a fully functional industrial base on Sector 47’s coastline to support humanity’s space program.
Automate component supply routes between factories, power stations, and test stands.
Every facility in Sector 47 requires reliable power. Construct photovoltaic fields, battery storage units, and high-voltage substations.
Scale installed electrical capacity from basic 4.0 MW starter reserves up to 100 MW+ high-voltage regional grid connections ($1.25M intertie).
Store excess solar power in grid battery stations (15% capacity ratio) to maintain uninterrupted research and manufacturing during night cycles.
Grade initial dirt roads ($5K/12m) into heavy paved asphalt thoroughfares ($10K/12m) so supply trucks can deliver rocket components rapidly.
Test liquid-fuel engines in real time on coastal test stands before authorizing flight assembly.
Run 60-second hot-fire qualification tests to reach 75%+ flight clearance.
Manufacture liquid oxygen and refined rocket fuel in heavy propellant plants.
Ensure power stability across high-draw rocket propellant chillers and test pumps.